Neighborhood Building Permit Updates
We have a large update since we haven’t done this in the past week or two. Nothing unexpected in here – another office building gets started (251 H St NW), Bedrock Billiards (714 7th St NW) begins construction, and the Cirque du Soleil is approved to occupy the old convention center parking lot.
- 09/12/06
251 H ST NW
TO ERECT A SEVEN STORY OFFICE BUILDING AS PER DRAWINGS.
RLA REVITALIZATION
09/18/06
714 7TH ST NW
COVERTING RETAIL T SHIRTS STORE TO A BAR / BILLARD POOL HALL/ 4200SF BSMT, INTERIOR BUILDOUT . BAR/ BILLARDS, NEW M,E,P
BEDROCK MANAGEMENT
09/20/06
999 E ST NW
INSTALL THREE FABRIC AWNINGS TO EXISTING BRACKETS. AWNING HAVE GALVANIZED STEEL FRAMES. CANVAS COVERS AND PAINTED SIGN
Rubicon- NGP Washington DC LLP
09/20/06
833 7TH ST NW
EXTERIOR RENOV TO REPLACEMENT EXISTING AFTER HOURS DEPOSITORY WITH NEW DEPOSITORY AND ADD NEW PACKAGE
PNC BANK
09/21/06
501 H ST NW
RESET PROTRUDING BRICKS IN 2ND TO 3RD FL. FRONT WALL AND POINT UP BRICK WORK AS NECESSARY
SING YAT FAMLY TRUST ELIZABETH
09/21/06
915 E ST NW
INSTALL OF DISAL FUEL PIPING FORE GENERATOR
JBGJER E Street LLC
09/21/06
707 7TH ST NW
INTERIOR WORK ONLY. INSTALL HVAC, ELECTRICAL OUTLETS, 20 LBS WALL FOR OFFICE AND STORAGE.
CLYDES RESTAURANT GROUP
09/26/06
716 7TH ST NW
RENOVATION OF 716 STORE FRONT, NEW EGRESS STAIR, FROM BASEMENT & NEW DEMISSING WALL IN BASEMENT BETWEEN 710
DOUGLAS DEVELOPMENT
09/27/06
900 9TH ST NW
TEMPORARY INSTALLATION OF TENTS FOR A THEATRICAL ENTERTAINMENT CIRCUS DU SLOEIL OCT. 11TH THRU 25TH 2006
WASHINGTON CONVENTIO CENTER AUT
09/28/06
730 11TH ST NW
REMOVE EXISTING SIGN AND REPLACE WITH NEW NAME SIGN IS ON EXISTING AWNING WHICH IS TO REMAIN.
C & R MANAGEMENT, LLC
If you enjoyed this post, please consider leaving a comment or subscribing to the feed and get future articles delivered to your feed reader.
Which site do you get these from ?