Penn Quarter Gains One More Sidewalk! (6th & F St NW)
The beautiful building at the corner of 6th & F St will house the Harman Center for the Arts – an expanded stage for the Shakespeare Theater.
Ever since construction began on the building, the sidewalk on the western side of 6th St had been closed (along the side with the victorian building seen in the first pic). A few days ago, the fence disappeared and we have our sidewalk back!
National Museum of Women in the Arts Presents After Hours VJ/DJ Event!
VJ/DJ: After Hours at NMWA
3/23/2007 6:00 PM – 10:00 PM
Free for members; General $20. No reservations required.
- In celebration of Women’s History Month and as part of the NMWA Film Program’s Emerging Artists/Emerging Media series, we are pleased to announce this exclusive Live Cinema event. Join the NMWA, the Embassy of Spain and the Embassy of Finland as we celebrate LIVE CINEMATIC DIPLOMACY in a collaboration in REAL-TIME ART!
Enjoy an exciting media experience with the cutting edge visual stylings of pioneering Finnish live cinema artist Solu, with DJ Samantha Waldram from Barcelona, Spain. Also performing will be VJ Tesia K of Chicago, with DC’s First Ladies DJ Collective. Drinks and light fare included, in our majestic Great Hall.
National Building Museum Tours The Newseum On April 7th
The National Building Museum will host a Construction Watch Tour of the new Newseum about 1 month before it is completed!
Here are the details:
- April 7
Construction Watch Tour
Newseum Redux
Saturday, 10:00 am – 12:00 pm
Designed by the New York-based architecture firm Polshek Partnership Architects, the Newseum is located on a prominent site on Pennsylvania Avenue in Washington, DC. The glass-fronted façade reveals a soaring atrium space and exhibitions, as well as a 535-seat theater, an 11,000-square-foot conference center, and a residential component facing C and Sixth Streets. Peter Mitnick with Turner Construction Company will lead a tour of this 650,000-square-foot project scheduled for completion in May 2007.
$20 Museum members only. Advance registration for The Corinthians, The Builders, and The Professional Circle begins March 23. Call 202.272.2448 between 9 am and 5 pm. General registration begins at 9 am on March 30; based on availability. To upgrade your membership, please call the Membership Office at 202.272.2448, ext. 3500
Penn Quarter Street Closings On Sunday (Penn Ave NW)
The 19th Annual St. Patrick’s Day 8K will be closing parts of Penn Ave NW between 7:30am and 11:30am on Sunday, March 18, 2007. Refer to the map for specifics.
Official announcement is here.