ARTrageous! At The Smithsonian American Art Museum (Dec 5)
The Smithsonian American Art Museum (8th & F St NW) is hosting its annual benefit party called ARTrageous!
The party will take place on Tuesday, December 5 from 7:30 – 10:30pm. Tickets are $100.
Highlights
- Walking Dinner
- Live Music
- Dancing
- ARTrageous Attire
All proceeds from ARTrageous go to support the museum’s educational programs
Contact: 202.633.4550 or SAAMDevelopment@si.edu
New Office Building Approved 700 6th St NW! (And Other Building Permits)
![]()
As the 777 6th St office building nears completion (that was fast!), the empty lot almost directly across the street (at 700 6th St NW) gains approval for another 12 story office building. Here is the official website for 700 6th St NW. It’s being built by Akridge.
The building will feature one of the city’s first green roofs funded by CBF grants – it’ll be 10,000-sq-ft. According to the official website, the building’s 1st floor can be retail or office.
The Downtown DC construction update pdf tells us that the 3 level garage will hold 152 parking spaces.
- 11/22/06
700 6TH ST NW
NEW BUILDING
$27,325,000.00
CONSTRUCTION OF NEW 12 STORY OFFICE BLDG, AS PER ATTACHED PLANS & PLAT
700 6TH ST VENTURE
- 11/13/06
1631 KALORAMA RD NW
INTERIOR TENANT BUILDOUT OF 37,405 SF GROCERY STORE WITH DELI COUNTER AS PER PLAN THIRD PARTY REVIEW
Harris Teeter
- 11/17/06
475 H ST NW
ADDITION/ALTERATION
$250,000.00
FRONT FAÇADE RENOVATION, ADDITION OF MERCHANDISE DISPLAY PROJECTION, REAR FAÇADE RENOVATION, 4TH FLOOR ADDITION,
MAX BROWN
- 11/20/06
975 F ST NW
TENANT LAYOUT
CONSTRUCT NEW OFFICE SPACE ON THE 5TH FLOOR PER PLANS. FIRST TENANT IS SPACE. THIRD PARTY REVIEW.
COLLEGE LOAN CORPORATION
- 11/20/06
1001 G ST NW
ALTERATION AND REPAIR
$249,500.00
INTERIOR DEMOLITION AND REPAIR TO SUIT TENANT DELOITTE APPROX. 16,925 SF ON THE 8TH FLOOR.
SQ 345 LIMITED PARTNERSHIP
- 11/21/06
400 MASSACHUSETTS AVE NW
SIGN
$5,000.00
INSTALL 2-SINGS PER ATTACED DRAWINGS AND CFA APPROVALO TO EXISTING ELECTRICAL, NO NEW ELECTRICAL WORK IS BEING DONE.
GRAYSTAR REAL ESTATE
- 11/22/06
100452 1025 F ST NW ALTERATION AND REPAIR
$274,444.00
RENOVATION TO OFFICE SPACE ON THE 7TH FLOOR, “GSA” PER PLANS. THIRD PARTY REVIEW.
JEMAL’S
Future Of MLK Library Uncertain
DCist has a nice wrap-up of the council decision (rather, indecision) on the future of the MLK Library at the old convention center site (at 9th and H St NW).
(Click on the old convention center site link above to see the approved plans as of 11/2/06)
Update: Anon correctly points out that the MLK Library plans are still up in the air, but the old convention center plans have been approved.
North Neighbors Making Progress
This is the CityVista construction site to the north of our neighborhood. The skeleton of The L is fully constructed and many of the windows are in place. There are two condo buildings (The L and The K) and one apartment building (The V) in the project. For us Penn Quarter residents, we’ll have to look to the “urban lifestyle” Safeway as the closest green grocer which will locate at the corner of 5th and K.